DFS Migration to another environment

 
 
Berlin142
Guest
Posts: n/a

 
      03-25-2010
I just have an interesting problem: In a branch office scenario with a
centralized data center (DC) we have a DFS running, where all file data will
be replicated to the DC for backup purposes. Now we need to exclude some
bbranch offices (soled) to a new company and also to a new network. They will
still work in the same manner like before.
We create the new file system and the DFS. But how I can migrate the data now?
Option1 : Perform a migration in the DC and replicate the data back. Because
we have up to 3.5 TB in the branches and only bandwidth for replication by ~2
MBit (QOS), this solution is not really feasible.
Option 2: Migrate the data locally, so that the user can still work with the
data and replicate the data back to the DC. This seems to be a little bit
better for the business continuity, ut we still have the replication issue to
transfer TB of data over the WAN (location are spread up to 2.500 km outside
from the DC).

The best option should be to add the data in the root (DC) and branches in
prallel and re-sync both sides. But this seems not to work, every side claims
the data complete and so it will replicate twice the whole content - even
worst. Is there any option (like pre-staging e.g.) what can be used for a
scenario like this? If not, I need to look for a complete other way (may be
travelling with a server sround, but we have ~60 branches in focus :-( ).

J.
 
Reply With Quote
 
 
 
 
Danny Sanders
Guest
Posts: n/a

 
      03-25-2010
>I just have an interesting problem: In a branch office scenario with a
> centralized data center (DC) we have a DFS running, where all file data
> will
> be replicated to the DC for backup purposes. Now we need to exclude some
> bbranch offices (soled) to a new company and also to a new network. They
> will
> still work in the same manner like before.


Does this mean that those "excluded" servers sold to a new company are going
to be in a new donain or on a different subnet?


> The best option should be to add the data in the root (DC) and branches in
> prallel and re-sync both sides. But this seems not to work, every side
> claims
> the data complete and so it will replicate twice the whole content - even
> worst. Is there any option (like pre-staging e.g.) what can be used for a
> scenario like this? If not, I need to look for a complete other way (may
> be
> travelling with a server sround, but we have ~60 branches in focus :-( ).


To prestage the data you can either restore from backups or use a robocopy
script to prestage the data on the hub server. Setup the replication group
so the branch office is the primary and only the difference will be
replicated to the hub server.


hth
DDS


"Berlin142" <> wrote in message
news:1D66EF34-2CE4-4497-BB43-...
>I just have an interesting problem: In a branch office scenario with a
> centralized data center (DC) we have a DFS running, where all file data
> will
> be replicated to the DC for backup purposes. Now we need to exclude some
> bbranch offices (soled) to a new company and also to a new network. They
> will
> still work in the same manner like before.
> We create the new file system and the DFS. But how I can migrate the data
> now?
> Option1 : Perform a migration in the DC and replicate the data back.
> Because
> we have up to 3.5 TB in the branches and only bandwidth for replication by
> ~2
> MBit (QOS), this solution is not really feasible.
> Option 2: Migrate the data locally, so that the user can still work with
> the
> data and replicate the data back to the DC. This seems to be a little bit
> better for the business continuity, ut we still have the replication issue
> to
> transfer TB of data over the WAN (location are spread up to 2.500 km
> outside
> from the DC).
>
> The best option should be to add the data in the root (DC) and branches in
> prallel and re-sync both sides. But this seems not to work, every side
> claims
> the data complete and so it will replicate twice the whole content - even
> worst. Is there any option (like pre-staging e.g.) what can be used for a
> scenario like this? If not, I need to look for a complete other way (may
> be
> travelling with a server sround, but we have ~60 branches in focus :-( ).
>
> J.



 
Reply With Quote
Reply

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are Off


Similar Threads
Thread Thread Starter Forum Replies Last Post
migration from SBS2003 - 2008 Grant Dickeson Windows Small Business Server 2 02-17-2010 11:30 AM
sbs migration Grant Dickeson Windows Small Business Server 0 02-16-2010 05:46 PM
Re: Migration from SBS2003 - 2008 Bill Sanderson Windows Small Business Server 2 01-24-2010 03:24 AM
SBS 2003 Physical to Virtual Conversion - Activation Issue Kris Server Migration 9 01-21-2010 06:56 PM
SBS2003 R2 to SBS 2003 - to swing or not to swing.... Jim Windows Small Business Server 21 11-30-2009 05:10 PM



1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59