Windows Vista Tips

Windows Vista Tips > Newsgroups > Windows Vista General Discussion > Scheduled Task Start/End Duration and Intervals

Reply
Thread Tools Display Modes

Scheduled Task Start/End Duration and Intervals

 
 
kirsch59
Guest
Posts: n/a

 
      06-30-2007
In Vista, I would like to schedule a task (bat program with shutdown command)
that runs weekly (Sun-Sat). It should start at 11:00 PM, run every 1 minute
for 8 hours. The task (batch job) should not run from 7:01AM-10:59PM.

I was able to set the scheduled task using XP; however, under Vista the task
keeps on running after the 8 hours.

Thanks
 
Reply With Quote
 
 
 
 
Radhika
Guest
Posts: n/a

 
      07-09-2008

Hello,

Even I am facing the same problem. I have scheduled a task to run on
weekdays (Monday to Friday) between 9:00 am to 5:00 pm. My task runs
even after 5:00 pm in the evening. Any idea how to get this resolved?

Thanks in Advance
Radhika


--
Radhika
Posted via http://www.vistaheads.com

 
Reply With Quote
Reply

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are Off


Similar Threads
Thread Thread Starter Forum Replies Last Post
Task Scheduler repeat task duration bug? sm02463 Windows Vista General Discussion 4 12-06-2008 06:40 PM
Vista Task Scheduler ignores duration D.P. Roberts Windows Vista General Discussion 3 12-06-2008 04:50 PM
Task Scheduler illegal duration error extreming Windows Vista General Discussion 0 10-12-2007 10:30 AM
Scheduled task failed njem Windows Vista General Discussion 0 08-20-2007 09:53 PM
Task Scheduler: Repeat Task and Duration kirsch59 Windows Vista General Discussion 6 07-11-2007 09:01 PM



1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59